When we purchased this house, we knew that the upstairs would need a huge overhaul. The reason for this being, the previous owners had 3 dogs, and carpet. For people with allergies, this is a HORRIBLE combination. We all suffer from allergies, so Brian and I asked my Mom if we could bunk up with her a little longer, and do some projects to get the house livable for the kids.
So, in all three bedrooms, we removed carpeting, baseboards, and doors. We also painted all the trim around the doors and windows as well as painted all the bedrooms, ceilings, closets, and hallway. We also switched out all the light fixtures as well as all the HVAC registers and returns (we had replaced the HVAC system, and had the ducts cleaned so we decided to replace all the registers and returns because they were all gunked up with dust and fur…ew). We had help with all of these jobs. Friends and family pitched in, and since this was before Brian was handy with a miter saw, we asked a contractor to install the flooring for us.
Keep in mind, I didn’t know we would have a blog about our home, so I don’t have too many before shots. The upstairs had different color bur bur carpeting in every room, dark walnut trim and doors (except for my daughter’s room) and muddy colored walls.
Without further ado.
4 comments
What a lot of hard work – so worth it! Looks great!
Thanks! It was a ton of hard work, but we were so grateful that our kids had a place to sleep that was comfortable and where they wouldn't be sneezing all night.
Take care,
Erin
Wow what great changes! Fun stuff!
Thanks! Still some work to do.
Take care,
Erin